Wabo® Air-Inflated at Upper Boat Bridge, Cardiff
In November 2018 RAB replaced four expansion joints at Upper Boat Bridge which had already previously, and very recently, failed twice. The client had originally specified a Type 6 EMR metal runner joint, which [...]
Tesla Gigafactory
Download the case study A custom Wabo® solution for a revolutionary facility If you ever decide to rock down to Electric Avenue in Sparks, NV, you'll stumble upon Tesla’s first Gigafactory, which [...]
Sunshine Skyway Bridge
Download the case study WBA's superior customer service allows swift turnaround on an urgent request Following a tragic ship collision that caused the collapse of the original bridge in 1980, Sunshine Skyway [...]
Oakland Bay Bridge, San Francisco
Download the case study Caltrans and WBA link up for iconic bridge In 2003, plans were initiated to design and construct a new bridge to replace the entire eastern section of Interstate 80 [...]
Miami Beach Convention Centre
Download the case study Rapid Responsiveness & Flexibility Large renovation projects entail large unknowns. As construction crews uncover issues, contractors and manufacturers must adjust to new requirements and timelines. Such is the [...]
Mercedes-Benz Stadium
Download the case study Top designers collaborate for a next-level stadiumAmbitious, innovative, and wholly-unique, Atlanta’s Mercedes-Benz Stadium was designed to set a new benchmark in stadium builds. Watson Bowman Acme worked closely with [...]